Building Placement Selected and Updates to Design Presented

During September and October, the Tisbury School Building Committee (TSBC) reviewed options for building placement on the existing site and design options for the new building. At the 9/25 meeting of the TSBC, a vote to proceed with “Option 3B” – a building location on the east section of the site – was approved. Updates to the schematic design of the interior spaces and examples of exterior finishes have been presented to the committee for consideration.

Other information can be found on the Documents page and the Meetings page, including past presentations, meeting minutes, and information about upcoming meetings.